Feltham Rail Depot
Armco barriers, GRP walkways, GRP bridge and HV cable framework for rail depot
Barriers and Secondary Steelwork
We surveyed, designed, manufactured and installed 700 metres of Armco barriers, GRP walkways, GRP bridge and HV cable framework at Feltham rail depot. We assisted Volker Fitzpatrick late on in the project to ensure key handover items were met for the end client.
GRP walkways were constructed on site to provide safe walkways for depot maintenance staff. Each area had slightly different configurations, so project and site teams had to work closely with client teams to ensure a safe and suitable solution. Health and safety was a key issue when installing the HV cable framework, as it involved working in and around the high voltage cables powering the adjacent live track.