Dforce Engineering

Specialist mezzanine platform for global automotive manufacturer

Secondary Steelwork

We designed and constructed a specialist mezzanine platform for a global automotive manufacturer. It was completed with three access staircases, balustrades and lifting points in a fully finished paint system to meet the client’s specification.

The complete structure had to be built in a factory for a working trial in and around robotic equipment and then dismantled and packaged for shipping overseas. The build was completed within a tight set period to allow for client inspection.

Clear construction plan for ease of erection and dismantling

Careful and controlled trial installation was required

Final top coat applied out of hours to minimise disruption to client's operations